• HOME
  • Projects
    • ALL PROJECTS
    • Habitas Clubhouse
    • Unilux Showroom
    • Tribeca Multifamily
    • Workshop Kitchen + Bar
    • Astoria Townhouse
    • Koukjian Jewelry Store
    • Long Island Townhouse
    • Westhampton Beach House + Pool
    • Tartinery Restaurant
    • Windsor Terrace Townhouse
    • Park Slope Townhouse
    • Manhattan Townhouse
    • Park Slope Apartment Combination
    • Clinton Hill Landmark Carriage House
    • Park Slope Duplex
    • Carroll Gardens Townhouse
    • Tokyo Vertical Cemetery
    • Scarsdale House
    • Park 51 (Islamic Cultural Center)
    • Zard House
    • Nassar House
    • Wave Residential Tower
    • Amchit Bay Resort Hotel
    • Park Avenue Apartment
    • Greenpoint Mixed-Use Building
    • Astoria Residential Building
    • Tribeca Penthouse
    • Six Residences Resort At Faraya
  • About
  • Blog
  • Services
  • Contact
SGUERA ARCHITECTURE & INTERIORS

Restaurant Case Study – Workshop Kitchen + Bar – Part 2: Water

by L S | Nov 10, 2018 | Case Studies, Projects

The construction permit arrives for a new sewer lateral under the existing concrete sidewalk at the street.

The construction permit arrives for a new sewer lateral under the existing concrete sidewalk at the street.

The existing location of city sewer lines is located with dig alert.

The existing location of city sewer lines is located with dig alert.

We used video in the pipe to locate the connection point.

We used video in the pipe to locate the connection point.

We then ran the sewer line all the way across the project site to the rear of the building where the grease trap was to be located underground and adjacent to the kitchen.

We then ran the sewer line all the way across the project site to the rear of the building where the grease trap was to be located underground and adjacent to the kitchen.

The massive grease trap arrives on site.

The massive grease trap arrives on site.

The grease trap being lowered into place.

The grease trap being lowered into place.

The grease interceptor is placed level with the finished parking lot so that the trap can be accessed and cleaned out at intervals.

The grease interceptor is placed level with the finished parking lot so that the trap can be accessed and cleaned out at intervals.

Connecting to the trap and sewer line at the kitchen. The floor beneath the kitchen becomes “swiss-cheese” due to all the runs required with the amount of equipment/floor drains required.

Connecting to the trap and sewer line at the kitchen. The floor beneath the kitchen becomes “swiss-cheese” due to all the runs required with the amount of equipment/floor drains required.

Partial plan at kitchen with equipment.

Partial plan at kitchen with equipment.

Floor drains connected, health department approved covered base and wall tile installation started as well as new electrical panel install at kitchen.

Floor drains connected, health department approved covered base and wall tile installation started as well as new electrical panel install at kitchen.